1. This site uses cookies. By continuing to use this site, you are agreeing to our use of cookies. Learn More.
  2. It's not long before we will be moving. The new hosting has been setup and the next thing to be done is to change the DNS. When it's changed it may take between 24 to 48 hours to take effect. During this time XLN will be closed so it can be backed up. When the new DNS takes effect, you will see a basic page with a message regarding the move. Note: It may take up to two weeks to get XLN up and running again.
    Dismiss Notice

Transportation 40M Expressway High Span Concrete Bridge 2014-08-24

40M Exressway High Span Concrete Bridge

  1. PaulJChris
    This is the expressway cousin of the 45M highway bridge I released last year. I could not get the expressway version to work , but after an 8 month break I had a fresh look at the files and found my error, so I thought should share. I had many requests for an expressway version at the time so here it is .

    [​IMG]

    MENU PLACEMENT:

    [​IMG]

    Download the .patch file and place in your mods folder.

    The custom tags for this bridge are already included in the UIM so V1.79.9 or higher required.
    Installation Pre-requiste(s):
    User Interface Mod by Altiris V1.79.9 or higher http://xlnation.net/content/xl-nation-user-interface-mod?page=142
    alex l, kipate, Saturn and 1 other person like this.