1. This site uses cookies. By continuing to use this site, you are agreeing to our use of cookies. Learn More.
  2. It's not long before we will be moving. The new hosting has been setup and the next thing to be done is to change the DNS. When it's changed it may take between 24 to 48 hours to take effect. During this time XLN will be closed so it can be backed up. When the new DNS takes effect, you will see a basic page with a message regarding the move. Note: It may take up to two weeks to get XLN up and running again.
    Dismiss Notice

Transportation New Bridge Connector Pieces For Rhm

Discussion in 'Transportation' started by Bill LJ, Oct 26, 2014.

  1. Bill LJ

    Bill LJ Unskilled Worker

    Joined:
    Sep 1, 2014
    Messages:
    29
    Likes Received:
    16
    RHM comes only with elevated connector pieces for the small highways (one lane, two lane) but not for the larger highways. It would be fantastic if someone could create all the connector pieces we have on the ground, but instead they would be elevated. No idea if this is possible or not but someone please give it a go.
     
    chanfors likes this.

Share This Page